Thursday, June 25, 2009

the projects

Here is a compilation of every project to be done. Hopefully we can get them all done in the next 12 months.

1. Front Exterior -
Phase 1: Remove visible brown wood and old gutters, replace with new wood, hardi lapsiding or shake and a vent in the gable. Replace all the fascia and trim work, and restore what is still in good shape.
Phase 2: Replace gutters
Phase 3: Restore beadboard ceiling and refinish the porch floors
Phase 4: Paint
Phase 5: Add 2 ceiling fans, 2 porch lights, new mailbox, and new house numbers


2. Kitchen -
Phase 1: Demolition - remove old cabinets, appliances, flooring, existing walls, trimwork and light fixures.
Phase 2: Electrical, plumbing, insulation, and subfloor repairs.
Phase 3: Frame out a new master closet protruding into the kitchen.
Phase 3: New drywall, new tile flooring, new switches/outlets, and ceiling repairs.
Phase 4: Paint and trim/casing/molding work.
Phase 5: Add new cabinets, countertops, sink fixtures and hook up appliances.
Phase 6: New light fixtures, cabinet hardware, switch/outlet plates, and window treatments - DONE!

3. Half Bath - inclusive with the kitchen
Phase 1: Demo old cabinetry and toilet(same time as kitchen)
Phase 2: Electrical, plumbing, and subfloor repairs (same time as kitchen)
Phase 3: New tile floor (same time as kitchen)
Phase 4: Paint and trim/casing/molding work (same time as kitchen)
Phase 5: Add new toilet, new vanity and mirror, and fixtures - DONE!

4. Laundry room - inclusive with the kitcen
Phase 1: Demo old walls, flooring, and trimwork (same time as kitchen).
Phase 2: Electrical, plumbing, and subfloor repairs (same time as kitchen).
Phase 3: New drywall, new tile floor, new outlets (same time as kitchen).
Phase 4: Paint and trim/casing/molding work, add washer and dryer - DONE!

5. Master bedroom
Phase 1: Finish the new closet with doors and hardware.
Phase 2: Repair the trim/casing/molding work and plaster walls.
Phase 3: Paint, window treatments, new switch/outlet plates, and light fixtures. - DONE!

6. Guest Bedroom
Phase 1: Build a non existing closet.
Phase 2: Repair trim/casing/molding work and plaster walls.
Phase 3: Paint doors/walls/trimwork, new switch/outlet plates, window treatments, and light fixtures. - DONE!

7. Guest Bedroom / Office
Phase 1: Repair trim/casing/molding work and plaster walls.
Phase 2: Paint doors/walls/trimwork, new switch/outlet plates, window treatments, and light fixtures. - DONE!

8. Full Bath
Phase 1: Demo old tile, flooring, fixtures, adjoining door frame to guest bedroom, walls/ceiling, closet, and re-install doorway to open the other direction.
Phase 2: Electrical, plumbing, subfloor repairs.
Phase 3: New walls, floors, electrical outlets
Phase 4: New shower tile, new shower fixtures, new curved shower rod
Phase 5: Paint then build a closet, and trimwork
Phase 6: New vanity, mirror, sink fixtures, light fixtures, towel racks/rings, re-install toilet, refinish tub - DONE!